posted on Friday, May 25, 2007 11:54 AM by Jennifer Rinker

Qualifying Facilities No Longer Generically Exempt from Reliability Standards

On May 18, FERC made good on its promise to extend reliability standards to Qualifying Facilities (QF).  Order No. 696 overhauls regulations governing small power production and cogeneration facilities by eliminating previous exemptions of QFs from compliance with section 215 of the Federal Power Act.  According to the final rule, FERC believes "there is not a meaningful distinction between QF and non-QF generators that warrants a generic exemption of QFs from reliability standards."  QF generators, FERC explained, affect the bulk-power systems as much as non-QF generators and should therefore be similarly subject to new mandatory reliability standards that become effective on June 4, 2007.  

Commenters during the Notice of Proposed Rulemaking process for Order No. 696 urged FERC to consider a number of factors in its evaluation.  FERC was not persuaded and denied generic exemptions, including exemptions for QFs below a certain size or ones serving only behind the meter load.  FERC instead directed that North American Electric Reliability Corporation (NERC) or Regional Entities could consider factors warranting specific exemptions when an individual QF is evaluated for registration (the general procedures for registration are outlined at Section 500 of NERC's Rules of Procedure).   FERC explained that, in this regard, Order No. 696 puts QFs and non-QFs on equal footing "to not be subject to reliability standards" since the registration process is designed to determine applicability of the standards on a case-by-case basis.  FERC also pointed out that QF's still have the opportunity to appeal to the agency if the QF believes its registration was in error.